Piping Training System Second Team Add-On
46105-CDescription
The Piping Training System Second Team Add-On allows two groups of students to work simultaneously on the same workstation, one in the front and one in the back.
The Piping Tools and the Piping Accessories are not supplied with this system. If two student groups work at the same time on the workstation, they must either share the same tools or perform separate work orders.
List of equipment
Qty | Description | Model Number |
---|---|---|
1 | Supports | 46751 |
1 | Storage Space | 46752 |
1 | Pipe Hangers | 46753 |
1 | Flowmeter GPM | 46760 |
1 | Pressure Gauge – 210 kPa (30 psi) | 46761 |
1 | Steel and Iron Pipes | 46782 |
1 | PVC Pipes | 46782-A |
1 | Hoses | 46782-B |
1 | Tubes | 46782-C |
1 | Steel and Iron Pipe Fittings | 46783 |
1 | PVC Pipe Fittings | 46783-A |
1 | Hose Fittings | 46783-B |
1 | Tube Fittings | 46783-C |
1 | Valves | 46784 |
1 | Instrumentation Accessories | 46785 |
1 | Piping Textbooks | 46786 |
1 | Piping Fundamentals (Workbook) | 39162-6 |
1 | Piping Fundamentals (Workbook (Instructor)) | 39162-7 |
1 | IPT's Pipe Trades (Workbook) | 39330 |
Additional equipment required to perform the exercises (Purchased separately)
Qty | Description | Model Number |
---|---|---|
1 | Piping Accessories | 46780 |
1 | Piping Tools | 46781 |