Request Information

For any questions about price, specific products, comments on Lab-Volt products or if you have any issue regarding Lab-Volt products, please contact us using the following email addresses :

services.didactic@festo.com
support.didactic.ca@festo.com
support.didactic.us@festo.com
 

Pumps Learning Systems

46106

Description

The Pumps Training Systems familiarize students with pump operation principles and associated maintenance tasks such as pump installation, lubrication, shaft alignment, inspection, and component replacement. Students also learn how to start up, operate, and troubleshoot industrial pumps in different configurations.

Furthermore, during these hands-on activities, students discover the impact of valve restriction, air injection, and Net Positive Suction Head (NPSH) on pump efficiency by using a cavitation valve, a load valve, and two different water reservoirs.

The modularity of the systems allows the selection of models required to meet customized training objectives. A wide variety of pumps are also offered as individual options. The pumps that can be added to the Pumps Training Systems correspond to the most common types found in industry. Students are introduced to the use, characteristics, and maintenance of each pump by disassembling the pump, and by measuring operating parameters.

Features & Benefits

  • Sturdy, yet flexible design integrating components that meet industrial safety standards and fit many different training needs
  • Comprehensive curriculum consisting of fully illustrated student manuals containing job sheets and/or work orders
  • 13 different types of industrial pumps (vane, flexible impeller, progressive cavity, peristaltic, pneumatic diaphragm, etc.)
  • Provides safe, hands-on industrial pumps training
  • Wide-range of industrial-grade components
  • Pumps can be dismounted and transparent pump cover allows cavitation observation
  • Configure variable speed drives using local panels or a software
  • Fault-insertion by the instructors
  • Latest three-phase ac drive included to vary the speed of motor-driven pumps
  • Easy electrical connections between the drive and motor can be made using banana jacks or terminal blocks

Topic Coverage

  • Pump installation
  • Lubrification
  • Shaft alignment
  • Inspection
  • Component replacement
  • Valve restriction
  • Air injection
  • Pump wiring
  • Fluid mechanics
  • Pump maintenance
  • Laser alignment
  • Vibration analysis
  • Estimated program duration: 96 hours

List of equipment

Description System Number
Pumps Training System 46106
Multiple Pump Training System Add-On 46106-1
Second Drive Option Add-On 46106-2

Downloads


Download Image

Pumps Training Systems
Download Image

Download Image
loading.gif

Texts that will be displayed have been partly translated by an automatic translation system.

To view any text in its original language (English), leave the mouse pointer on this text (or touch the text if you use a tablet).